Logo
Solar Energy Solutions / Consulting, Design & Engineering

Decisions you can defend.
Drawings a bank will accept.

Before you buy a single panel, you should know what your site can produce, what it will cost, and what it will return. We do that work first, in writing — and if the numbers don't support the project, we say so.

Drawings reviewed on site before a single order is placed.
Why this stage matters

A solar plant is decided before it is built

The most expensive mistakes in solar are made at a desk, early, and discovered on a roof, years later. A system sized on guesswork strands capital or leaves savings unclaimed. Weak engineering quietly costs 15–20% of lifetime generation through layout, shading and string-design errors that no amount of maintenance can recover.

  • Capacity sized from twelve months of measured consumption, not assumptions
  • Yield modelled at conservative irradiance and performance figures
  • Structural, grid and compliance constraints surfaced before procurement
  • Returns calculated the way your lender will calculate them

The study costs a fraction of the plant. It protects all of it.

The feasibility stage is paperwork, deliberately.
What you receive

Four documents, no ambiguity

Every engagement ends with a package you can hand to a board, a bank or another contractor. It is yours either way.

Feasibility report
Load analysis, site assessment, yield estimate and payback period — modelled at deliberately conservative assumptions.
Engineering package
Single-line diagram, array layout, structural calculations, earthing and protection design to IS/IEC standards, ready for DISCOM, CEIG and lender review.
Incentive map
Accelerated depreciation, Section 80-IA positioning, GST input credit, subsidies and net-metering benefits, itemised for your CA to confirm.
A recommendation
Go, or no-go, with reasons. We have advised clients not to build. That is the point of the study.
How we work

From first call to final drawings

Typically four to six weeks for a commercial site, depending on access and DISCOM response times.

1

Energy audit

Twelve months of bills, load profile, tariff structure and seasonal variation, analysed before anyone visits your site.

2

Site assessment

Roof or land condition, orientation, shading, structural capacity, grid connectivity and metering — measured, photographed, documented.

3

System engineering

String layout, inverter selection, evacuation scheme and protection design, with yield simulated across seasonal and degradation scenarios.

4

Financial model

Generation, savings and 25-year returns with every incentive mapped in — at assumptions your lender will accept.

5

Report and decision

The full package, walked through with you in person. Questions answered until there are none left.

Why Atvantiq

The habits of an infrastructure company

We came to solar from twenty years of building telecom and EV infrastructure that had to work on day one and keep working. Those habits carry over.

Engineers run the analysis

The people assessing your site are certified electrical and structural engineers, not a sales team with a calculator.

We carry the design forward

The team that produces the drawings is the team that builds and commissions from them. Nothing is lost in handover, because there is no handover.

Twenty years of site work

The judgement in our reports comes from 10,000+ infrastructure deployments — we know what survives on an Indian roof and what doesn't.

Get an engineering-led answer.

One call and your electricity bills are enough to start. You'll know within weeks whether solar is worth building — and exactly what it would take.

Book a consultation

What happens next: a 30-minute call, no obligation. Bring your last 12 months of electricity bills if you have them. We reply to every enquiry within one working day — or call us on +91 774-300-8365.